Robotic arm for packing with producing and maintaining logistics systems using Automated Guided Vehicle (AGV).

Fortune 500 Company Reduces Operating Costs

Substantial Savings For Manufacturing Plant

Retrofit Provides Efficient Return

Manufacturing Plant Saves $233k Annually With Suite of Solutions

A large public company was determined to identify a partner that could maximize their efficiency budget across the multitude of assets they owned. They had corporate backing to move forward efficiency projects, but needed to find a firm that could address as many issues as possible within the perimeters of the dollars that were available.

This team turned to STS to deliver a comprehensive plan that would drive down costs at their large manufacturing and distribution facilities, as well as optimize energy usage and costs at their numerous retail locations. Through a thorough audit of one of their manufacturing sites, STS was able to identify lighting and mechanical solutions that improved the property, reduced costs, and fell within the predefined return on investment range.

Industrial buildings and facilities at manufacturing plant
Industrial buildings and facilities at manufacturing plant
tractor-manufacture-work-2021-08-29-01-15-22-utc
plans-to-manufacture-parts-2021-09-02-15-42-47-utc
Welder used grinding stone on steel in factory with sparks
cropped image of smiling multicultural businessmen shaking hands in office
tractor-manufacture-work-2021-08-29-01-15-22-utc

The Need

This manufaturer needed a partner that could identify solutions that would encompass their unique footprint of facilities.

plans-to-manufacture-parts-2021-09-02-15-42-47-utc

The Project

STS identified, procured, and installed efficiency measures that included LEDs, building controls, and software for network integration.

Welder used grinding stone on steel in factory with sparks

The Results

•$233k in annual savings
•ROI of 2.7 years
•Improved Operation Efficiency

cropped image of smiling multicultural businessmen shaking hands in office

The Conclusion

With over $230k in annual savings this organization was able to work with STS to find opportunities at their other types of properties.

Find Out how

STS Can Help Your Organization

Contact one of our efficiency specialists to start your path towards budgetary cost savings and energy independence